Apply for a gas meter set
1. Before filling out the meter set request form, ensure that the following has been completed:
- gas service installed
- meter template is installed
- gas piping
- manifold (if applicable)
- appliances and thermostat installed, all are accessible and operational
- hydro is working and the pressure test tag is posted
If we are unable to set the meter as a result of these items being incomplete, an hourly service call fee will be billed to you.
2. Complete and submit the meter set request form online or by email.
Costs and fees
The one-time meter set fee of $207.22 plus HST is charged for all new gas meter installations.
Apply for a water meter
1. Email us at watermetershop@kitchener.ca to request a water meter application form.
2. Have your plumber review the meter installation requirements.
Water meters are provided by appointment only. Email us and complete the water meter request form to arrange a pick up.
Please note, for large water meters the meter pick-up and delivery will require a minimum of five business days to process, depending on current meter inventory. For residential meters, the order will be ready for pick up within five business days.
If you have questions regarding water meters, view the City of Kitchener Development Manual and review the Kitchener Utilities forms section, or contact the Water Meter Shop by phone at 519-741-2600 ext.4537.
If you require a new water or sewer service, please our development webpage or contact by phone 519-741-2406 or email.
Request a gas service final inspection
We are responsible for inspecting all gas appliances that are installed in the home prior to occupancy. A final inspection must be completed.
Once your gas meter is installed and you require a final inspection, complete and submit a final inspection request online or by email.
All appliances that will be present at the time of occupancy must be present and initiated by the builder’s licensed contractor. If a forced air furnace is present, the completion of a finishing heat activation form is required. Once the final inspection is complete and successful, the “Final Inspection Required” seal will be removed from the meter and a “Final Inspection Approved” seal will be applied to the primary heating appliance and /or the gas meter. This approval seal is needed to assist in granting an occupancy certificate.
If the final Inspection fails, an applicable minimum service charge will apply.
To review a drawing for the gas meter installation, refer to drawing D12.101.